This project involved the relocation of the CURE Waste Building from the rear entry adjacent to the emergency department to the west side of the F Building at the Albany Medical Center. As a result, several space reconfigurations were made to the adjacent building structures to allow for the construction of a new approximately 2,700 square foot single story building addition plus connector roofs encompassing a total project area of approximately 4,300 square feet. The new building infilled space between existing buildings located on three sides of the new building.